If you plan to install solar or another renewable energy source, you must complete the distributed energy interconnection application prior to installation. Click here for the distributed energy resource interconnection application and other renewable energy tips.
Interconnection standards:
- Service installation specifications for residential services requiring conduit
- Distributed energy resource (DER) tap box installation 1.20A1
- Distributed energy resource (DER) tap box installation 1.20A2
- Distributed energy resource (DER) tap box installation 1.20A3
- Distributed energy resource (DER) back feed breaker 1.20B
- Distributed energy resource (DER) meter pole installation 1.20C